Exploration cost and price of technical reports for various items of mineral investigation/ geological investigation.
(Approved by Government vide G.O. (P) 102/2001/ID dt. 26-4-2001 pub. in KG. No. 28 dt. 10-7-2001)
|
Item |
Particulars |
Rate |
|
|
A |
Geochemical sampling |
Rs. 5000 per sq.km. |
|
|
Geological mapping (Scale 1 :50,000) |
Rs. 8000 per sq.km. |
||
|
B |
I. Diamond Core Drilling |
||
|
(i) Soft formation/ sedimentary area |
Rs. 1500 per metre |
||
|
(ii) Medium hard laterite/sandy |
Rs. 2500 per metre |
||
|
(iii) Hard rock/crystalline rock |
|||
|
(a) Depth range 0-100m |
Rs. 3000 per metre |
||
|
(b) Depth range 100m-200m |
Rs. 3500 per metre |
||
|
(c) Beyond 200m |
Rs. 4000 per metre |
||
|
II. Hand auger Drilling |
|||
|
(i) For tile and brick clay (Depth range |
Rs 100 per metre |
||
|
(ii) For Silica and (Depth range 0-6m) |
Rs. 200 per metre |
||
|
III. Probing for Lime Shells |
|||
|
Inland |
Rs. 30 per hole |
||
|
Lake |
Rs. 30 per hole plus actual charges for Canoe/Country boat/ motor boat |
||
|
IV. Pitting and Trenching |
|||
|
(a) Soft Clay formation |
|||
|
(i) Upto 2 m |
Rs. 100 m3 |
||
|
(ii) 2m to 4m |
Rs. 200 m3 |
||
|
(iii) 4m to 6m |
Rs. 300 m3 |
||
|
(b) Hard Laterite/Weathered rock |
|||
|
(i) Up to 2m |
Rs. 150 m3 |
||
|
(ii) 2m to 4m |
Rs. 400 m3 |
||
|
(iii) 4m to 6m |
Rs. 600 m3 |
||
|
V. Detailed Geological Mapping and |
Rs. 50,000 per Sq. km. |
||
|
Add. charge for chemical/mineralogical analysis |
Rs. 10,000 |
||
|
And Report preparation Rate per Sq. km. |
Rs.60,000 |
||
|
Price of Reports |
|||
|
Per work of the total expenditure incurred towards investigation. |
Rate subject to a minimum |
||
|
(i) Up to Rs. 0.5 lakh |
2.00 % |
1000 |
|
|
(ii) 0.5 lakh to 1 lakh |
1. 60% |
2000 |
|
|
(iii) 1 lakh to 5 lakh |
1.20 % |
30000 |
|
|
(iv) 5 lakh to 10 lakh |
0.8 % |
10000 |
|
|
(v) over 10 lakh |
0.4 % |
15000 |
|
|
While pricing the investigation report a certain percentage of the cost of the preliminary and detailed investigation (drilling, sampling, core logging, surveying) etc., and the analytical work for the evaluation of the deposit may be levied or 1% of the royalty amount of the established whichever is greater. |
|||



