Mineral Exploration and Prospective Division
Fees for services rendered by Mineral Exploration and Prospective Division
Sl. No. |
Particulars |
Rates as per G.O.(P)No.44/2018/Fin dt. 17.3.18 |
|
After 5% increased vide G.O.(P)No.28/ 2019/Fin dt. 8.3.2019 |
A |
Geochemical sampling
Geological mapping (scale 1:50,000) |
Rs.16,305 per sq.km
Rs.26,565 per sq.km |
Rs.17,125 per sq.km
Rs.27,895 per sq.km |
|
B |
1. Diamond Core Drilling
(i) Soft formation/sedimentary area
(Depth rage 0-100m)
(ii) Medium hard laterite/sandy alluvial
tract (Depth range 0-100m)
(iii) Hard rock/Crystalline rock
a) Depth range 0-100 m
b) Depth range 100 -200m
c) Beyond 200m |
Rs.5250 per metre
Rs.9190 per metre
Rs.10500 per metre
Rs.12470 per metre
Rs.13285 per metre
|
|
Rs.5515 per metre
Rs.9650 per metre
Rs.11025 per metre
Rs.13095 per metre
Rs.13950 per metre
|
|
II. Hand Auger Drilling
i) For tile and brick clay
(depth range 0-6m)
ii) For silica sand (depth range 0-6m)
iii) Probing for lime shells
In land
Lake |
Rs.475 per metre
Rs. 870 per metre
Rs. 130 per hole
Rs. 130 per hole plus actual charges for canoe/country boat/motor boat
|
|
Rs.500 per metre
Rs.915 per metre
Rs.140 per hole
Rs. 140 per hole plus actual charges for canoe/country boat/motor boat
|
|
IV. Pitting & trenching
a) Soft clay formation
i) Upto 2 m
ii) 2m to 4m
iii) 4m to 6m
b) Hard laterite/weathered rock
(i) upto 2 m
(ii) 2m to 4m
(iii) 4m to 6m |
Rs.475 per m3
Rs. 870 per m3
Rs. 1260 per m3Rs.630 per m3
Rs. 1445 per m3
Rs. 2100 per m3 |
Rs.500 per m3
Rs. 915 per m3
Rs. 1325 per m3Rs.665 per m3
Rs. 1520 per m3
Rs. 2205 per m3 |
|
|
V. Detailed geological
mapping and contouring
(scale 1:1000 to 1:5000, contour interval 2m) (including trenching, sampling etc)
Add: charge for chemical/ mineralogical analysis |
Rs.1,63,015/- per sq.km
Rs.32,605 per sq.km
|
|
Rs.1,71,170/- per sq.km
Rs.34,240 per sq.km
|
|
Report preparation |
Rs.1,95,615 per sq.km |
|
Rs.2,05,400 per sq.km |
|
Prices of Reorts
per work of the total expenditure incurred towards investigation
|
Rate |
Subject to a minimum |
Rate |
Subject to a minimum |
|
|
i)up to Rs.0.5lakh
ii)0.5 lakh to 1 lakh
1 lakh to 5 lakh
5 lakh to 10 lakh
Over 10 lakh |
2.63%
2.1%
1.58%
0.97%
0.48% |
3940
7875
11815
36225
54340 |
2.76%
2.21%
1.66%
1.02%
0.50% |
4140
8270
12410
38040
57060 |
|
While pricing the investigation report a certain percentage of the cost of the preliminary and detailed investigation (drilling, sampling core logging, surveying) etc and the analytical work for the evaluation of the deposit shall be levied or 1% of the royalty whichever is greater.